Lien Rights Management: Create and Mail Lien Documents

Create, complete, and track lien rights documents directly in Siteline by digitizing your compliance forms and generating project-specific notices in just a few clicks.

Written by Bradley LaFave
Updated over 2 weeks ago

You can now generate, complete, and mail lien rights documents directly in Siteline—including documents like Preliminary Notices or Notices to Owner—using the Lien Rights Management feature.

If you need help on using the Lien Rights Management feature to track your project's requirements, check out this article.

Instead of filling these out manually, you can digitize your existing compliance templates into Siteline forms and reuse them across projects, just like pay app forms.

What You’ll Do in This Workflow

  1. Digitize your lien rights documents as Siteline forms

  2. Generate and complete (or upload) documents for a specific project

  3. Download, print, or mail documents


Step 1: Create Your Lien Rights Forms

Before you can generate documents for a project, you’ll need to create your forms in Siteline. You can do this from either location below.

Option A: Create Forms from the Form Library

  1. Go to Company Settings → Form Library (Click your company name dropdown in the upper right, then Company Settings, then the Form Library tab.)

  2. Click Add New Form

  3. Upload your lien rights document (such as Preliminary Notice or Notice to Owner) and select Compliance as the form type. Finally click Submit Forms after completing all fields.

Wait until the form is available like other forms in Siteline.

Option B: Create Forms from Lien Rights

  1. Open the Lien Rights Tracker under the Compliance header in the navigation bar

  2. From the Projects screen, click the three vertical dots in the upper-right corner and select Add New Forms

  3. Upload and digitize your compliance document similarly to the steps above.


Step 2: Start Document Creation for a Project

  • Select a project first (or you can skip to the next step if you want to use the action like Add filing date from the projects screen)

  • Locate the appropriate action under the lien rights milestones, such as Add filing date (in this example we'll file a notice to owner)

  • The confirmation dialog box will appear.

    • If you've already filed and want to upload the completed documentation for a system of record, choose Upload completed document. Once uploaded, this keeps a clean record in Siteline without recreating the document.

    • If you need to create the document, choose Generate and complete. This is the action we'll take for the next steps.

  • Search for your previously created template form (in step 1) from the form library and then click Generate form.

  • On the form workflow screen, complete the required fields and signatures to make the document specific to this project. You can use the Next field button in the upper right to instantly skip directly to the fields that needs completed.

  • Once all fields are completed, review the document one last time. The Next field button will then turn into a Complete forms button.


Step 3: Complete the Form (Download, Print, or Mail)

  • Continuing from the previous steps above, click the Complete forms button.

After completion, you can:

  • Download the document

  • Print the document

Send the Document through USPS

  • Select the Send button in the upper right after generating a document.

  • On the Mail screen, you can edit the from/return if you need to update your return address. To select the who the mail is going to, select +Add Recipient.

  • On the Add recipient screen, fill in address information (email not required). Once completed, click Add.

  • You'll then return back to the Mail screen with available printing and shipping options. Select the Save button.

  • Lastly, verify all information is correct and select Send notice.

Mailing & Delivery Timeline

Siteline partners with a third-party vendor for printing and mailing services.

Print processing time:
Requests submitted before midnight ET are processed within 2 business days.

  • If you submit before 9:00pm PT, it will be printed the next business day and handed to USPS the following business day.

  • If you submit after midnight ET (9:00pm PT), processing begins the next business day.

The delivery timeline begins once the mail is handed off to USPS.

USPS Delivery Expectations:
For First Class Mail, USPS estimates delivery within 5–7 business days, but based on experience, delivery may take 7–10 business days due to regional processing speeds, seasonal volume, or local transit delays.

Pricing Note: Mailing and printing prices are set by our third-party vendor and reflect their production, handling, and mailing services. These rates may differ from standard USPS retail pricing.

Mailing Options Explained

  • Certified Mail
    Provides proof that the item was mailed and includes tracking to confirm delivery.

  • Certified Mail with Electronic Return Receipt
    Includes Certified Mail tracking plus an electronic confirmation of delivery (instead of a physical green card).

  • Priority Mail (1–3 Business Days)
    USPS expedited service with faster estimated delivery and tracking included.

Track the Mail Shipment

  • Back on the project screen, select the vertical three dots and choose track delivery. The track delivery screen will open showing delivery status.

  • Alternatively, back on the main lien rights tracker page, you can select the track delivery button to get to the same delivery status screen.