Stored Material (manual mode)

Written by Bradley LaFave

If you need stored material to move to previously billed only when the material has been installed:

1. Under the project settings, you will want to click edit

Screenshot 2025-04-28 at 10.17.39 AM.png

2. You will then want to change the setting for stored material to "manually adjust amount each month"

Screenshot 2025-04-28 at 10.18.24 AM.png

3. When you click on the payapp an hover over the stored material, there will now be a pencil button that you can click.

Screenshot 2025-04-28 at 10.18.56 AM.png

4. A pop up will appear in which you can manually adjust how much moves to the previously billed column and how much stays in "currently stored"

Screenshot 2025-04-28 at 10.19.05 AM.png